Road work image

Scheduled preventive maintenance for Mt. Vernon Road/US 25 in Madison County has begun and will continue through Sept. 30.

The cape seal treatment slows deterioration of pavement, reduces upkeep and the costs of construction. In addition, it provides motorists with increased safety. The anticipated completion date for the project is Sept. 30.

Affected areas are as follows:

• Alternating lane closures will be in effect between milepoints 0 and 2.86 (a distance of 3 miles) .

• The section begins at the Rockcastle-Madison County line and extends north to KY 21. Flaggers will be onsite to guide and direct motorists.

• The speed limit will be 25 MPH through the work zone.

(KDOT)

Recommended for you